Skip to content
Monday – Friday: 6:30 a.m. – 4:30 p.m.Punch-list visit within 2 working daysCrews on the lot by 6:30 a.m.(407) 555-0102

Phase schedule

What each paint phase needs, and what you will see

Read it across: the left column is what we wait for, the middle is what is on the lot when we leave, the right is how long a typical home takes.

What each paint phase needs, and what you will see
PhaseYou will see on the lotSample days per homeWe need from you
Scope walkYou will see on the lotA written color list, signed off with your superSample days per homeHalf a dayWe need from youPlan set, finish schedule, lot or unit list
Exterior prime and body coatYou will see on the lotMasked windows and an even body coatSample days per home2 to 3 daysWe need from youStucco cured, scaffold up, water on site
Interior primeYou will see on the lotWalls and ceilings in primer, flaws markedSample days per home1 to 2 daysWe need from youDrywall sanded and signed off, power and lights on
Trim, doors and cabinetsYou will see on the lotSmooth, caulked trim and doorsSample days per home2 to 3 daysWe need from youTrim carpentry done, doors hung, floors covered
Finish coatsYou will see on the lotFinished ceilings and wallsSample days per home2 daysWe need from youCabinets set, finished floors protected
Punch-list returnYou will see on the lotA photo of every item, then a walk with your superSample days per home3 days from the listWe need from youYour list, by text, spreadsheet or app export

Against your schedule

We plan around the trade ahead of us

A bid names the phases, the sample days and the trigger for each one. When a trade slips, we move the phase and tell your super the same day, instead of showing up to a lot that is not ready.

  • One written start window per phase

  • Model homes scheduled as their own phase

  • A named lead for each lot

Two-story new-build house wrapped in scaffolding while stucco and siding go on

The punch-list visit

What a punch-list visit covers

The visit is for our own work. Damage from other trades is priced in writing before we touch it.

  • On the list

    What we fix as part of the bid.

    • Touch-up paint on walls, ceilings and trim

    • Re-caulking at joints that opened

    • Missed spots and runs

    • Hardware and fixtures re-masked and cleaned

  • Priced first

    What we agree on in writing before we start.

    • Repairs to other trades' work

    • Drywall patches the paint exposes

    • Colors changed after the schedule is set

    • Return visits beyond the one in the bid

Paperwork

Documents for your sub file

Download them here, or ask Casandra to send them with your bid. The license and registration numbers shown are samples until the owner fills them in.

  • Downloads for your sub file

    • Certificate of insurance (COI)

      PDF, sent with every bid

    • Form W-9

      PDF, signed by the owner

    • Subcontract and insurance requirements

      We sign yours, or send ours

  • County registration

    • Business Tax Receipt

      FL Registration 000000 · Orange County Tax Collector

      A county permit to do business.

  • Lead-safe firm

    • Lead-Safe Certified Firm (RRP)Verify

      US Certificate 000000 · U.S. EPA

      Needed for paid work that disturbs paint in homes built before 1978.

  • Insurance

    • General liability and workers' comp

      Insurance carrier · Policy # 000000

      A certificate of insurance goes with every bid.

  • On the lot

    • Punch-list visit within 2 working days

    • Crews on the lot by 6:30 a.m.

Questions

Scheduling, weather and paperwork

How much notice do you need for a phase?

Send the phase, the lot count and the dates you are aiming for. We answer with a start window in writing, and the schedule you accept goes into the subcontract.

What happens when it rains?

Afternoon storms and standing dew move exterior work. We don't spray in rain or where overspray would carry, and we tell your super that morning which lots have moved.

Do you paint model homes and sales centers?

Yes. We schedule a model as its own phase with its own color schedule, and add a touch-up visit before the sales office opens.

How and when do you invoice?

By phase, against your draw schedule. Payment terms are written into the subcontract before we start.

Who approves the colors?

Your design review or the developer's architectural committee does. We work from the approved color schedule and flag any lot that departs from it.

What does the warranty cover?

Our workmanship on the paint we apply is covered by our written warranty. Terms, limits and exclusions are in that document, and manufacturers' product coverage is separate.