How we bid

How pricing works on new construction

No lump sums. Every bid lists the phases, so you can compare it with your budget line by line.

  • What decides the price

    The plans set the price. These are the things that move it.

    • Homes or units in each model

    • Square footage and ceiling heights

    • Finish schedule and number of colors

    • Height and access: scaffold or lift

  • What the bid includes, and what it doesn't

    Each phase lists its surfaces, coats and products. It leaves out repairs to other trades' work and colors added after the schedule is set.

  • What happens at the walk

    Norberto or Casandra walks the model or the first lot with your super, reads the finish schedule and confirms colors, sheens and who supplies the paint.

  • When you get the number

    In writing, by email, with each phase on its own line and the COI and W-9 attached. If the plans change, the bid changes with them.

  • How and when you pay

    By phase, against your draw schedule. Payment terms are written into the subcontract before we start.

  • If the job changes

    A change in scope, a color switch or a repair we find is priced and agreed in writing before we do it.

A good bid

What a written bid states

Eight lines you can check against your plans. If a bid you get leaves one out, ask for it.

What a written bid states
LineA vague bid saysA written bid states
ScopeA vague bid says"Paint the homes"A written bid statesEvery model, room type and surface, by name
ProductsA vague bid says"Premium paint"A written bid statesType and sheen for each surface
CoatsA vague bid says"Two coats, probably"A written bid statesPrimer and finish coats, counted
ColorsA vague bid saysExtra colors found on the invoiceA written bid statesThe number of colors, with the approved schedule
PrepA vague bid says"Includes prep"A written bid statesMasking, caulking and spot-priming listed
ScheduleA vague bid says"We'll get to it"A written bid statesA start window and sample days per phase
PaymentA vague bid saysTerms found after the work startsA written bid statesInvoiced by phase, against your draw schedule
ExclusionsA vague bid saysNot mentionedA written bid statesWhat is left out, named

Questions

Bid questions

What do you need to write a bid?

The plan set or a model list, the finish schedule, the number of lots and the window you want us on site. If the plans aren't final, we bid what is drawn and list what isn't.

How much notice do you need for a phase?

Send the phase, the lot count and the dates you are aiming for. We answer with a start window in writing, and the schedule you accept goes into the subcontract.

How and when do you invoice?

By phase, against your draw schedule. Payment terms are written into the subcontract before we start.

What does the warranty cover?

Our workmanship on the paint we apply is covered by our written warranty. Terms, limits and exclusions are in that document, and manufacturers' product coverage is separate.